Subsidy SetuMSME subsidy and compliance

Haryana · Technology Upgradation

Haryana Research and Development Centre Scheme 2026

Open
Maximum benefit
50% of project cost, up to ₹5 Crore
Who can apply
Micro, Small, Medium enterprises
Status
Open; current term ends 28 July 2031

Is R&D Centre Scheme open? Key facts at a glance

R&D Centre Scheme (Haryana): 50% of project cost, up to ₹5 Crore.

Last verified: 19 Oct 2026. How we check our information

StatusOpen
LevelHaryana State scheme
Type of benefitCapital Grant for R&D Infrastructure
Maximum benefit50% of project cost, up to ₹5 Crore
Project cost range₹50 Lakh – ₹10 Crore
Who can applyMicro, Small, Medium enterprises (Manufacturing)
Implementing agencyDirectorate of MSME, Haryana
Where to applyInvest Haryana (HEPC) portal
Official notificationRead the notification · notified 29 July 2026
Current term ends28 July 2031
Last verified19 Oct 2026 · How we check

What is R&D Centre Scheme?

Clause 4.3.2 of the Haryana Progressive MSME & Export Promotion Policy 2026 assists manufacturing MSMEs in setting up Research & Development Centres or laboratories, at 50% of project cost up to ₹5 Crore; within this, the cost of building is admissible only up to 25% of the project cost.

The centre may be standalone or within the premises of an existing or new enterprise, and it must be recognised by the Department of Scientific and Industrial Research (DSIR) or the Council of Scientific & Industrial Research (CSIR).

Because recognition takes time, a unit may apply within three years of the R&D unit commencing operations.

Eligible cost covers infrastructure and utilities (excluding land), buildings, plant, machinery, equipment, power backup, hardware and software; working capital, pre-operative expenses, capitalised interest, technology acquisition and know-how, consultancy, royalty, design, patents and other IP costs are excluded.

Official notification · notified 29 July 2026

What could a unit get under R&D Centre Scheme?

The ceiling the scheme sets. What a particular unit receives depends on its project cost, location and the conditions on this page, so no rupee figure is worked out here.

Up to the scheme’s limits: 50% of project cost, up to ₹5 Crore

Illustrative only: this is the scheme’s maximum, not an estimate for your unit. Source: Haryana Progressive MSME & Export Promotion Policy 2026 — Haryana Govt. Gazette (Extra.) No. 114-2026/Ext, 29 July 2026.

Eligible business types

Manufacturing

MSME categories covered

MicroSmallMedium

Eligible industries

🏭 Manufacturing🍽️ Food Processing🧵 Textiles & Garments🏥 Healthcare & Pharma⚡ Renewable Energy

How do I apply for R&D Centre Scheme?

  1. Register the enterprise on Udyam and keep the GSTIN active.
  2. File the claim online on the Invest Haryana (HEPC) portal under this scheme, with the supporting records for the expenditure claimed.
  3. Clause 3.7 of the policy promised operational guidelines within three months of notification, that is by 29 October 2026. That date has passed: as of 1 November 2026 they had still not been published on the Directorate of MSME's website (last updated 26 October 2026) or the Industries & Commerce Department's website, and the policy itself names no portal, claim form or cut-off date, so check whether the guidelines have been published before filing. Clause 3.7 also says an application consistent with the policy is not barred because a scheme has not been notified.

Apply at: Invest Haryana (HEPC) portal

Which documents are needed for R&D Centre Scheme?

  • Udyam Registration
  • GSTIN
  • DSIR or CSIR recognition of the R&D centre
  • R&D centre project report
  • Equipment quotations/invoices
  • Building documents

Can R&D Centre Scheme be combined with other schemes?

This scheme can be combined with the following for higher total benefits:

Why are R&D Centre Scheme applications rejected?

  • R&D centre not recognised by DSIR or CSIR
  • Application made more than three years after the R&D unit commenced operations
  • Building cost claimed above 25% of project cost
  • Land, know-how, consultancy or IP costs included in project cost

Subsidy Setu's DPR preparation process addresses all common rejection points before filing.

Frequently asked questions about R&D Centre Scheme

Is R&D Centre Scheme open?
Yes. The current term runs until 28 July 2031. Status last verified: 19 Oct 2026.
Who can apply for R&D Centre Scheme?
Micro, Small, Medium enterprises (Manufacturing).
What is the maximum benefit under R&D Centre Scheme?
50% of project cost, up to ₹5 Crore.
How do I apply for R&D Centre Scheme?
1. Register the enterprise on Udyam and keep the GSTIN active. 2. File the claim online on the Invest Haryana (HEPC) portal under this scheme, with the supporting records for the expenditure claimed. 3. Clause 3.7 of the policy promised operational guidelines within three months of notification, that is by 29 October 2026. That date has passed: as of 1 November 2026 they had still not been published on the Directorate of MSME's website (last updated 26 October 2026) or the Industries & Commerce Department's website, and the policy itself names no portal, claim form or cut-off date, so check whether the guidelines have been published before filing. Clause 3.7 also says an application consistent with the policy is not barred because a scheme has not been notified. Apply at: Invest Haryana (HEPC) portal.
Until when can I apply for R&D Centre Scheme?
The current term runs until 28 July 2031. Projects must usually be registered or commence within the term; check the cut-off before you rely on it.

Related schemes

Want this subsidy? Talk to our expert team

Leave your name and mobile number. Our team calls you back within one working day (Monday to Saturday).

Your details are never sold; they are shared only as our Privacy Policy describes.