Subsidy SetuMSME subsidy and compliance
Serving Rohtak from Gurugram and Hisar

MSME Subsidy Consultants in Rohtak

Haryana and Central government subsidies for manufacturers and service units in Rohtak — eligibility check, DPR, filing and post-sanction compliance, handled by our expert team from our offices in Gurugram and Hisar, Haryana.

MSMEs in Rohtak

Rohtak is a fastener and light-engineering town. The MSME-DI profile calls it the “city of fasteners”: nuts, bolts, screws, tools and dies and industrial fasteners are exported to Europe, Australia and Africa, and many small units work as ancillaries to LPS, the large fastener manufacturer in the town. HSIIDC’s Industrial Model Township at Kheri Sadh on the Delhi road has brought general engineering, auto-ancillary, paint and dairy units, and the district sits on NH-9 between our Hisar office and Delhi.

Subsidy Setu works with units in Rohtak from its offices in Gurugram and Hisar, Haryana. Filing is online on the State portal; we travel for site visits and for meetings at the District MSME Centre (DMC), Rohtak whenever a claim needs them.

Schemes open to units in Rohtak

Haryana schemes first, then the Central schemes an individual unit can claim. Superseded, closed and cluster-only schemes are left out. Each page is checked against the official notification it cites.

Start with the Haryana policy

All Haryana schemes · All Central schemes

Industries in Rohtak and the schemes that fit

The district's main lines of business, from the sources listed under “Sources for this page” below, with the open schemes whose eligibility tags include each one. Sector-specific policies are not listed here; the eligibility checker applies their conditions.

How we work with units in Rohtak

Four stages, one team. Where a claim needs physical verification or a query from the District MSME Centre (DMC), Rohtak, we prepare the papers and replies it asks for and can accompany you to meetings, travelling from Gurugram and Hisar as needed.

  1. 1

    Eligibility check

    A short call on your unit, location and investment plan, checked against every open State and Central scheme — including the restrictive lists and area categories that decide the rate.

  2. 2

    DPR and documents

    A bank-format Detailed Project Report with projections, DSCR and the incentive schedule, plus the Udyam, GST, land and expenditure records each claim asks for.

  3. 3

    Filing and follow-up

    We file on the State portal, answer every query and keep the claim moving until sanction.

  4. 4

    Post-sanction compliance

    Instalment claims, utilisation certificates, annual returns and the conditions attached to the sanction, tracked year by year so nothing lapses.

Questions from Rohtak

Is a plot in IMT Rohtak “Sub-Prime” or “Intermediate” under the Haryana 2026 policy?

An HSIIDC plot allotted as on 29 July 2026 (a Regular Letter of Allotment issued by then) is Intermediate, and a plot not allotted by that date is Sub-Prime; if the estate also lies in a conforming industrial zone of the Development Plan, the policy does not say which category applies, so that is to be verified by our expert team. The category sets the capital investment subsidy rate (20% or 25% of eligible capital expenditure respectively, for thrust-sector manufacturers and exporters) and the stamp duty refund, so we read the allotment letter before putting a number on anything.

A fastener unit in Rohtak wants to add CNC machines — which schemes apply?

For an expansion project: the 2026 capital investment subsidy on the new plant, the interest subsidy on the term loan for the new machines, the MSME Automation scheme (25% of eligible cost, capped by area), and the testing-equipment and quality-certification schemes if you are upgrading the lab or going for ISO/IATF. Under the scheme notifications of 16 November 2026 the capital subsidy on an expansion needs added fixed capital investment of at least 50% of the existing gross FCI and a bank term loan of at least 20% of the project cost, the interest subsidy covers a term loan for new machinery and needs ZED Silver, and the automation, testing-equipment and quality-certification schemes need ZED Gold. On the Central side, CGTMSE can make the loan collateral-free. The same machines cannot carry both the capital subsidy and the automation support; we check the rest of the stacking for your case.

Do you come to Rohtak?

Yes. Rohtak is on NH-9 from Hisar, so site visits and meetings at the District MSME Centre at IDC Chowk are routine for us. The claim itself is filed online on the Invest Haryana New Single Window portal.

Subsidy Eligibility Report · ₹2,999 + GST

Get the rupee figure for your own project, in writing

Our expert team works out the area category of your site, every scheme that fits and a rupee estimate for each. Ready in 3 working days. The full ₹2,999 is adjusted against our fee for any work you give us within 90 days, so the report costs nothing if you go ahead.

Order my reportWhat is inside

Setting up in Rohtak? Ask us

Leave your name and mobile number. Our team calls you back within one working day (Monday to Saturday).

Your details are never sold; they are shared only as our Privacy Policy describes.

Planning a unit or an expansion in Rohtak?

Two minutes with the free checker shows which schemes you can claim. A consultation turns that into a plan, a DPR and a filing.

Sources for this page

Page checked on 22 October 2026.

Industry and estate details are as described in these sources; scheme figures come from the notifications cited on each scheme page. General information, not advice — eligibility is confirmed case by case.

Other districts we serve

All districts