Subsidy SetuMSME subsidy and compliance
Subsidies & Schemes

Haryana MSME Policy 2026: Scheme Guidelines Notified on 16 November 2026, What Changed and What to Do Now

On 16 November 2026 Haryana notified the 20 schemes of its Progressive MSME & Export Promotion Policy 2026. The rates stay as in the policy, but new conditions apply: bank loans, ZED levels, land and three-month claim windows. What changed, the deadlines and a checklist.

Subsidy Setu Editorial Team 6 min read
In this article
  1. What changed
  2. The 20 notified schemes
  3. Deadlines in the next three months
  4. Checklist

On 16 November 2026 Haryana notified the operational guidelines for 20 schemes of its Progressive MSME & Export Promotion Policy 2026 (Haryana Govt. Gazette Extraordinary No. 175-2026/Ext). The subsidy rates are unchanged. What changed are the conditions: a bank term loan for the capital subsidy, ZED certification for most schemes, a set application form and claim windows of about three months. Some of those windows close by about mid-February 2027, so check what applies to you now.

Sources checked: 24 November 2026

Facts checked on 17 November 2026 against each of the 20 scheme notifications of 16 November 2026 and the policy (Gazette No. 114-2026/Ext, 29 July 2026); rechecked on 24 November 2026 against the Directorate of MSME's policy page, which lists the 20 scheme notifications and shows no amendment or corrigendum.

What changed

  • A filing route. Apply online on the Invest Haryana New Single Window portal, in each scheme's Annexure I form. Until it is working, the Directorate of MSME accepts applications under its existing procedure or by e-mail, as it specifies. No web address is printed.
  • The capital subsidy needs a bank. The project must be appraised by a bank, with a term loan of at least 20% of project cost; own money must also be at least 20%, and the land owned or leased for at least 15 years. Apply before commercial operations begin; the grant comes in two halves.
  • ZED certification is a condition of many schemes, from Bronze to Gold.
  • Narrower costs. Civil works count up to 30% of project cost for the capital subsidy; taxes, used machinery and many items are excluded.
  • Central grants count. No Government of India grant for the same component under the capital subsidy, and the 100% of Fixed Capital Investment cap now includes Government of India help.
  • Short windows. Most claims are due within three months of the cost or event, and a late claim is forfeited unless the delay is condoned.

Planning a new unit or an expansion? See which Central and State schemes match your business. Check eligibility, free

The 20 notified schemes

Scheme For Headline Key new condition
Capital investment subsidy Thrust-sector manufacturing MSMEs and exporters 15–30%, up to ₹4 crore Bank term loan and own money of 20% each
Interest subsidy Manufacturing micro and small units 5–7% on machinery loans; 3% on export credit ZED Silver; new machinery loans only
Net SGST reimbursement Manufacturing micro and small units 20–70% of Net SGST for 7 years ZED Silver; claim after GSTR-9
Stamp duty refund MSMEs 30–100% of stamp duty on land Claim within 3 months of first sale
Insurance Manufacturing micro and small units 33% of premium, up to ₹5 lakh a year ZED Silver; fire NOC
Employment Manufacturing MSMEs Up to ₹1.00–1.20 lakh per local employee a year Manufacturing only; ZED Silver (Gold for exporters)
Greening: energy efficiency, circular economy, solar, ETP/ZLD MSEs; MSMEs for solar and ETP/ZLD 25–40% up to ₹1 crore; solar 30%; ZLD up to ₹5 crore Installed from 29 July 2026; 15-year lease
Automation Manufacturing micro and small units 25%, up to ₹1 crore ZED Gold; bank term loan
AI solutions and labs Manufacturing micro and small units 33%, up to ₹10–15 lakh ZED Bronze; provider in Haryana
R&D centre MSMEs 50%, up to ₹5 crore After DSIR or CSIR recognition
First-time exporter New manufacturing exporters 33%, up to ₹20 lakh a year ZED Gold; IEC from 29 July 2026
ECGC premium Manufacturing MSME exporters 40%, up to ₹5 lakh a year ZED Gold
Freight New manufacturing MSE exporters 1% of FOB, up to ₹30 lakh a year ZED Gold; RCMC
Trade fairs Manufacturing micro and small units Up to ₹4.50 lakh or ₹7.50 lakh a fair ZED Silver; Gold abroad
E-commerce Manufacturing micro and small units 75% of fees, up to ₹1 lakh a year (₹2 lakh for exporters) Manufacturing only; ZED Silver (Gold and IEC for exporters)
Quality certification Manufacturing micro and small units 50%, up to ₹10 lakh a year ZED Gold
Testing equipment Manufacturing micro and small units 50%, up to ₹25 lakh a year ZED Gold; new equipment
Cluster Plug & Play Developer of an industrial facility 50% up to ₹5 crore, or 40% up to ₹10 crore At least 5 acres of purchased land
PADMA Export Parks Agency running a PADMA park Extra ₹10 crore, once 70% of units exporting
Common Facility Centre SPV of micro and small units 80% up to ₹5 crore, or 70% up to ₹10 crore SPV must be a Section 8 company

The green incentives are four parts of one notification, the Greening & Sustainable Development Scheme. Each scheme page gives the full conditions and documents.

Subsidy Eligibility Report · ₹2,999 + GST

Get the rupee figure for your own project, in writing

Our expert team works out the area category of your site, every scheme that fits and a rupee estimate for each. Ready in 3 working days. The full ₹2,999 is adjusted against our fee for any work you give us within 90 days, so the report costs nothing if you go ahead.

Deadlines in the next three months

  • Within three months of 16 November 2026 (about mid-February 2027; confirm the last day with the Directorate): the capital subsidy for a unit that started commercial operations between 29 July and 16 November 2026; and claims for anything done since 29 July 2026 under the insurance, green, automation, AI, R&D, first-time exporter, ECGC, trade fair, e-commerce, quality certification and testing equipment schemes. A Cluster Plug & Play project begun before 29 July 2026 must also apply in this window.
  • Stamp duty refund: within three months of the first sale bill, with no extra time from 16 November 2026. A unit that started production in August 2026 may already be late and would need condonation (up to 3 months by the Director or Director General, MSME; up to 6 months by the Administrative Secretary).
  • Not yet due: the yearly interest, Net SGST and freight claims for 2026-27 fall due within three months of 31 March 2027. The Net SGST claim is made only after that year's GST annual return (GSTR-9, and GSTR-9C where needed) is filed, so plan to file the annual return early; our guide to GSTR-9 for FY 2025-26 explains the return.

Checklist

  1. Check your area category as shown on the Government of Haryana's Single Window Portal, which is used unless the Competent Authority decides otherwise. Our Know your zone tool helps.
  2. Note the ZED level each scheme you want needs, and start ZED early.
  3. For the capital subsidy, get the bank appraisal and a term loan of at least 20% of project cost before you plan anything else.
  4. Keep the land title: a sale deed, an allotment letter or a registered lease of at least 15 years.
  5. List every cost, purchase or certificate since 29 July 2026 and its claim window.
  6. Line up the CA certificates (with UDIN), Chartered Engineer certificates and notarised declarations.
  7. Ask the Directorate of MSME which interim route it accepts until the portal works.

Our step-by-step application guide covers each window and document, and the eligibility checker shows which schemes match your unit. The Directorate decides every claim.

Find out what your project can claim

The free check takes five short steps about your unit, with your name and phone so we can follow up, and lists the Central and State schemes that match. For a rupee estimate for each scheme and the steps in order, order the Subsidy Eligibility Report.

Or WhatsApp us

Need help with this? Ask our expert team

Leave your name and mobile number. Our team calls you back within one working day (Monday to Saturday).

Your details are never sold; they are shared only as our Privacy Policy describes.

Schemes in this article

Eligibility, rates, documents and current status for each, on its scheme page.

Frequently asked questions

Have the Haryana MSME Policy 2026 guidelines been published?

Yes. Twenty scheme notifications under the Haryana Progressive MSME & Export Promotion Policy 2026 were published on 16 November 2026 in Haryana Govt. Gazette (Extraordinary) No. 175-2026/Ext. Each sets its form, documents, time limit and deciding officer, and each applies from 29 July 2026.

Where do I apply?

Online on the Invest Haryana New Single Window portal, in each scheme's Annexure I form. The notifications print no web address. Until the new portal is working, the Directorate of MSME, Haryana accepts applications under its existing procedure or by e-mail, as it specifies.

My unit started production in September 2026. Am I too late?

Not for the capital subsidy: a unit that started commercial operations between 29 July and 16 November 2026 must apply within three months of 16 November 2026. The stamp duty refund is different: it must be claimed within three months of the first sale bill, with no extra time, so check that date now.

Did the subsidy rates change?

No. The rates and caps are those of the 29 July 2026 policy. What changed are the conditions, such as a bank term loan and own contribution of at least 20% each for the capital subsidy, ZED certification for many schemes, and narrower eligible costs.

Sources

#haryana#msme-policy-2026#guidelines#capital-subsidy#zed-certification#deadlines
Share: WhatsApp LinkedIn X

This article is general information for Indian MSMEs, not advice on your specific case. Scheme terms, tax rates and due dates change; the sources above were checked when the article was written or last updated (How we check our information). Speak to a professional before acting on it.

Keep reading

How to Apply for Haryana MSME Subsidy in 2026: Step by Step

The scheme rules under the Haryana Progressive MSME & Export Promotion Policy 2026 were notified on 16 November 2026. Where to apply, when to file each scheme, the two instalments of the capital subsidy, the bank loan, ZED and land conditions, the certificates and the three-month window for units that started early.

Subsidy Setu Editorial Team

Practitioner with something to add? Write for us.