Haryana MSME Policy 2026: Scheme Guidelines Notified on 16 November 2026, What Changed and What to Do Now
On 16 November 2026 Haryana notified the 20 schemes of its Progressive MSME & Export Promotion Policy 2026. The rates stay as in the policy, but new conditions apply: bank loans, ZED levels, land and three-month claim windows. What changed, the deadlines and a checklist.
On 16 November 2026 Haryana notified the operational guidelines for 20 schemes of its Progressive MSME & Export Promotion Policy 2026 (Haryana Govt. Gazette Extraordinary No. 175-2026/Ext). The subsidy rates are unchanged. What changed are the conditions: a bank term loan for the capital subsidy, ZED certification for most schemes, a set application form and claim windows of about three months. Some of those windows close by about mid-February 2027, so check what applies to you now.
Sources checked: 24 November 2026
Facts checked on 17 November 2026 against each of the 20 scheme notifications of 16 November 2026 and the policy (Gazette No. 114-2026/Ext, 29 July 2026); rechecked on 24 November 2026 against the Directorate of MSME's policy page, which lists the 20 scheme notifications and shows no amendment or corrigendum.
What changed
- A filing route. Apply online on the Invest Haryana New Single Window portal, in each scheme's Annexure I form. Until it is working, the Directorate of MSME accepts applications under its existing procedure or by e-mail, as it specifies. No web address is printed.
- The capital subsidy needs a bank. The project must be appraised by a bank, with a term loan of at least 20% of project cost; own money must also be at least 20%, and the land owned or leased for at least 15 years. Apply before commercial operations begin; the grant comes in two halves.
- ZED certification is a condition of many schemes, from Bronze to Gold.
- Narrower costs. Civil works count up to 30% of project cost for the capital subsidy; taxes, used machinery and many items are excluded.
- Central grants count. No Government of India grant for the same component under the capital subsidy, and the 100% of Fixed Capital Investment cap now includes Government of India help.
- Short windows. Most claims are due within three months of the cost or event, and a late claim is forfeited unless the delay is condoned.
Planning a new unit or an expansion? See which Central and State schemes match your business. Check eligibility, free
The 20 notified schemes
| Scheme | For | Headline | Key new condition |
|---|---|---|---|
| Capital investment subsidy | Thrust-sector manufacturing MSMEs and exporters | 15–30%, up to ₹4 crore | Bank term loan and own money of 20% each |
| Interest subsidy | Manufacturing micro and small units | 5–7% on machinery loans; 3% on export credit | ZED Silver; new machinery loans only |
| Net SGST reimbursement | Manufacturing micro and small units | 20–70% of Net SGST for 7 years | ZED Silver; claim after GSTR-9 |
| Stamp duty refund | MSMEs | 30–100% of stamp duty on land | Claim within 3 months of first sale |
| Insurance | Manufacturing micro and small units | 33% of premium, up to ₹5 lakh a year | ZED Silver; fire NOC |
| Employment | Manufacturing MSMEs | Up to ₹1.00–1.20 lakh per local employee a year | Manufacturing only; ZED Silver (Gold for exporters) |
| Greening: energy efficiency, circular economy, solar, ETP/ZLD | MSEs; MSMEs for solar and ETP/ZLD | 25–40% up to ₹1 crore; solar 30%; ZLD up to ₹5 crore | Installed from 29 July 2026; 15-year lease |
| Automation | Manufacturing micro and small units | 25%, up to ₹1 crore | ZED Gold; bank term loan |
| AI solutions and labs | Manufacturing micro and small units | 33%, up to ₹10–15 lakh | ZED Bronze; provider in Haryana |
| R&D centre | MSMEs | 50%, up to ₹5 crore | After DSIR or CSIR recognition |
| First-time exporter | New manufacturing exporters | 33%, up to ₹20 lakh a year | ZED Gold; IEC from 29 July 2026 |
| ECGC premium | Manufacturing MSME exporters | 40%, up to ₹5 lakh a year | ZED Gold |
| Freight | New manufacturing MSE exporters | 1% of FOB, up to ₹30 lakh a year | ZED Gold; RCMC |
| Trade fairs | Manufacturing micro and small units | Up to ₹4.50 lakh or ₹7.50 lakh a fair | ZED Silver; Gold abroad |
| E-commerce | Manufacturing micro and small units | 75% of fees, up to ₹1 lakh a year (₹2 lakh for exporters) | Manufacturing only; ZED Silver (Gold and IEC for exporters) |
| Quality certification | Manufacturing micro and small units | 50%, up to ₹10 lakh a year | ZED Gold |
| Testing equipment | Manufacturing micro and small units | 50%, up to ₹25 lakh a year | ZED Gold; new equipment |
| Cluster Plug & Play | Developer of an industrial facility | 50% up to ₹5 crore, or 40% up to ₹10 crore | At least 5 acres of purchased land |
| PADMA Export Parks | Agency running a PADMA park | Extra ₹10 crore, once | 70% of units exporting |
| Common Facility Centre | SPV of micro and small units | 80% up to ₹5 crore, or 70% up to ₹10 crore | SPV must be a Section 8 company |
The green incentives are four parts of one notification, the Greening & Sustainable Development Scheme. Each scheme page gives the full conditions and documents.
Subsidy Eligibility Report · ₹2,999 + GST
Get the rupee figure for your own project, in writing
Our expert team works out the area category of your site, every scheme that fits and a rupee estimate for each. Ready in 3 working days. The full ₹2,999 is adjusted against our fee for any work you give us within 90 days, so the report costs nothing if you go ahead.
Deadlines in the next three months
- Within three months of 16 November 2026 (about mid-February 2027; confirm the last day with the Directorate): the capital subsidy for a unit that started commercial operations between 29 July and 16 November 2026; and claims for anything done since 29 July 2026 under the insurance, green, automation, AI, R&D, first-time exporter, ECGC, trade fair, e-commerce, quality certification and testing equipment schemes. A Cluster Plug & Play project begun before 29 July 2026 must also apply in this window.
- Stamp duty refund: within three months of the first sale bill, with no extra time from 16 November 2026. A unit that started production in August 2026 may already be late and would need condonation (up to 3 months by the Director or Director General, MSME; up to 6 months by the Administrative Secretary).
- Not yet due: the yearly interest, Net SGST and freight claims for 2026-27 fall due within three months of 31 March 2027. The Net SGST claim is made only after that year's GST annual return (GSTR-9, and GSTR-9C where needed) is filed, so plan to file the annual return early; our guide to GSTR-9 for FY 2025-26 explains the return.
Checklist
- Check your area category as shown on the Government of Haryana's Single Window Portal, which is used unless the Competent Authority decides otherwise. Our Know your zone tool helps.
- Note the ZED level each scheme you want needs, and start ZED early.
- For the capital subsidy, get the bank appraisal and a term loan of at least 20% of project cost before you plan anything else.
- Keep the land title: a sale deed, an allotment letter or a registered lease of at least 15 years.
- List every cost, purchase or certificate since 29 July 2026 and its claim window.
- Line up the CA certificates (with UDIN), Chartered Engineer certificates and notarised declarations.
- Ask the Directorate of MSME which interim route it accepts until the portal works.
Our step-by-step application guide covers each window and document, and the eligibility checker shows which schemes match your unit. The Directorate decides every claim.
Find out what your project can claim
The free check takes five short steps about your unit, with your name and phone so we can follow up, and lists the Central and State schemes that match. For a rupee estimate for each scheme and the steps in order, order the Subsidy Eligibility Report.
Or WhatsApp usNeed help with this? Ask our expert team
Leave your name and mobile number. Our team calls you back within one working day (Monday to Saturday).
Your details are never sold; they are shared only as our Privacy Policy describes.
Schemes in this article
Eligibility, rates, documents and current status for each, on its scheme page.
- Haryana Progressive MSME & Export Promotion Policy 202615–30% of eligible capital expenditure, up to ₹4 Crore
- Haryana Interest Subsidy Scheme 20265–7% on machinery term loans, up to ₹20–25 lakh a year; 3% on export credit, up to ₹10 lakh a year
- Haryana Net SGST Reimbursement Subsidy for Intra-State Sales SchemeUp to 70% of Net SGST for 7 years (20–70% by area and B2C share)
- Haryana Stamp Duty Refund Scheme 202630–100% refund of stamp duty, by area category
- Haryana Employment Generation Subsidy Scheme 2026Up to ₹1.00–1.20 Lakh per local employee a year for 10 years (₹1.20 Lakh only for special categories where locals are 15% or more)
- Haryana Freight Subsidy for Exporters Scheme 20261% of FOB value or actual freight (lower), up to ₹10–30 lakh a year by area
- Mukhya Mantri Pratham Niryatak Protsahan Yojana 202633% of export-entry costs, up to ₹20 lakh a year for any 3 years
- Haryana Export Credit Insurance Premium Support Scheme 202640% of the ECGC premium, up to ₹5 lakh a year for 5 years
- Haryana MSE Insurance Scheme 202633% of premium, up to ₹5 lakh per year for 3 years
- Haryana Energy Efficiency Promotion for MSEs 202625% up to ₹50 Lakh, or 40% up to ₹1 Crore by area
- Haryana Circular Economy Promotion for MSEs 202625% up to ₹50 Lakh, or 40% up to ₹1 Crore by area
- Haryana Solar Rooftop Support for MSMEs 202630% of eligible expenditure, up to ₹25–35 Lakh by area
- Haryana Environment Compliance Assistance (ETP & ZLD) 202625%, up to ₹1 Crore (ETP, Sub-Prime & Prime/Focus only) or ₹5 Crore (ZLD)
- Haryana MSME Automation Scheme 202625% of eligible cost, up to ₹50 lakh or ₹1 crore by area
- Haryana Adoption of AI Solution/Labs Scheme 202633%, up to ₹10 lakh for AI solutions and ₹15 lakh for an in-house AI lab
- Haryana Research and Development Centre Scheme 202650% of project cost, up to ₹5 crore
- Haryana Market Development Assistance Scheme 2026Up to ₹4.50 lakh per national fair or ₹7.50 lakh per international fair (25% of stall costs plus travel and boarding)
- Haryana Support for Market and Business Expansion (E-Commerce) Scheme 202675% of platform fees, up to ₹2 lakh a year (exporters) or ₹1 lakh a year (other MSEs), for 5 years
- Haryana Quality Certification Assistance Scheme50% of certification cost, up to ₹10 lakh a year for any 3 years (exporters: 60%, up to ₹20 lakh a year for any 2 years)
- Haryana Testing Equipment Assistance Scheme50% of cost, up to ₹25 lakh a year, twice in the policy period
- Haryana Cluster Plug & Play Scheme 202650% of project cost up to ₹5 Crore (5 acres, 10 sheds) or 40% up to ₹10 Crore (10+ acres, 20 sheds)
- PADMA Export Parks Scheme 2026Additional ₹10 Crore per PADMA park with 70%+ exporting units
- Haryana MSE Common Facility Centre Scheme 202680% grant up to ₹5 Crore (10+ MSEs) or 70% up to ₹10 Crore (15+ MSEs)
Frequently asked questions
Have the Haryana MSME Policy 2026 guidelines been published?
Yes. Twenty scheme notifications under the Haryana Progressive MSME & Export Promotion Policy 2026 were published on 16 November 2026 in Haryana Govt. Gazette (Extraordinary) No. 175-2026/Ext. Each sets its form, documents, time limit and deciding officer, and each applies from 29 July 2026.
Where do I apply?
Online on the Invest Haryana New Single Window portal, in each scheme's Annexure I form. The notifications print no web address. Until the new portal is working, the Directorate of MSME, Haryana accepts applications under its existing procedure or by e-mail, as it specifies.
My unit started production in September 2026. Am I too late?
Not for the capital subsidy: a unit that started commercial operations between 29 July and 16 November 2026 must apply within three months of 16 November 2026. The stamp duty refund is different: it must be claimed within three months of the first sale bill, with no extra time, so check that date now.
Did the subsidy rates change?
No. The rates and caps are those of the 29 July 2026 policy. What changed are the conditions, such as a bank term loan and own contribution of at least 20% each for the capital subsidy, ZED certification for many schemes, and narrower eligible costs.
Sources
- Haryana Progressive MSME & Export Promotion Policy 2026 — Haryana Govt. Gazette (Extra.) No. 114-2026/Ext, 29 July 2026 (Department of MSME, Haryana policy page)
- Directorate of MSME, Haryana: the nodal Directorate for the schemes notified on 16 November 2026 (its policy page lists the 20 scheme notifications)
- Haryana e-Gazette — Haryana Govt. Gazette (Extraordinary) No. 175-2026/Ext, 16 November 2026 (the scheme notifications)
- ZED Certification Scheme, Ministry of MSME
This article is general information for Indian MSMEs, not advice on your specific case. Scheme terms, tax rates and due dates change; the sources above were checked when the article was written or last updated (How we check our information). Speak to a professional before acting on it.