Project report guide · Agri and livestock processing
Project report for an agri or livestock processing unit: what banks expect
In this guide
- How the unit works, step by step
- Inputs, utilities and approvals
- Customers, staff and risks
- The 24 sections of a bank-format DPR
- A worked cost of project (illustrative)
- 34 open Haryana and Central schemes
What the bank reads first
A bank or a subsidy department reads a project report for an agri or livestock processing unit to answer three questions: does the promoter understand how the business works, do the costs and projections hang together, and can the loan be repaid from the cash the unit earns. This guide sets out what such a report covers for this sector, in the order of the 24-section bank format our free DPR builder produces.
The sector notes below come from the library our DPR builder uses to write the descriptive sections of a report. They describe how such a unit usually works; they carry no market size, growth rate or typical cost, because those have to come from the promoter's own enquiries and quotations. The schemes are taken from our catalogue, open on the date the page was built, and are named with each scheme's own ceiling.
The sector in brief
The main operating factors are seasonal and price variation in raw material, hygiene and product quality, and dependable collection and distribution arrangements.
How the work is done
The process the “Products and Process” section of the report describes, in order.
- Collection or procurement of produce from farmers, collection centres or mandis, with quality checks.
- Cleaning, grading and primary processing.
- Main processing (for example milling, chilling and processing, mixing or drying, as the product requires).
- Testing of the product for quality and safety.
- Packing, storage and dispatch to buyers.
Raw material and products will be tested for quality and safety, with hygienic handling, batch records and storage under suitable conditions.
Raw materials and utilities
Typical inputs: farm produce or livestock products suited to the activity, permitted additives and packing material.
Raw material will be procured directly from farmers, farmer producer organisations and collection centres near the unit, which also supports the local rural economy.
- Electricity for the processing line and storage.
- Water for processing and cleaning.
- Chilling or cold storage where the product requires it.
Approvals the report should name
In addition to Udyam, GST and the power and local-body approvals for the premises. Typically required where applicable; whether each applies depends on the size, location and activity, and is to be confirmed for the project.
- Registration or licence from the Food Safety and Standards Authority of India (FSSAI) for food products, appropriate to the scale of operations.
- Consent to Establish and Consent to Operate from the State Pollution Control Board, where the activity falls within its consent categories.
- Approvals from the State animal husbandry or agriculture department for feed, dairy or livestock activities, where applicable.
- Legal metrology registration for pre-packed products sold to consumers.
Market, customers and staff
- Customers
- Wholesalers, retailers, processors, institutional buyers and, for feed, dairy and poultry farmers.
- How it sells
- Direct supply to buyers, distributors and dealers, co-operative and institutional channels, and own retail outlets.
- What wins orders
- Buyers look for consistent quality, freshness, reliable supply and price.
- Employment profile
- The workforce will include operators, helpers for collection, cleaning and packing, a person for quality testing and staff for procurement, accounts and sales.
Risks a lender will ask about
The risks the sector library gives the SWOT section of the report, each with the way the project handles it.
| Risk | How the project handles it |
|---|---|
| Seasonal and price variation of raw material | Storage, procurement planning and tie-ups with farmer groups. |
| Quality and safety lapses | Testing, hygienic handling and records. |
| Disease or weather affecting the supply of produce | Sourcing from a wider area and maintaining buffer stock. |
Opportunities the report can point to
- Steady availability of raw material from the surrounding area.
- Value addition to local farm produce.
- Support available for agri and allied activities, where the project qualifies.
The 24 sections of a bank-format DPR
The structure our free DPR builder produces for every sector, after the cover page and contents.
The project and the promoter
Who is setting up the unit, what it will make or sell, how the work is done, where the inputs come from, who will buy, where the unit sits and how long it takes to start. A banker reads these first to judge whether the promoter understands the business.
- 1. Project at a Glance
- 2. Promoter & Enterprise Profile
- 3. The Project
- 4. Industry Overview
- 5. Products and Process
- 6. Raw Materials and Utilities
- 7. Market and Marketing Strategy
- 8. Location and Infrastructure
- 9. Implementation Schedule
The money
What the project costs, how it is paid for, the assumptions behind the projections, the yearly profit, cash flow and balance sheet, the loan repayment schedule, and the ratios a lender looks at: debt service coverage, break-even and the key indicators. Every figure flows from the cost of project and the assumptions, so they must agree with each other.
- 10. Cost of Project
- 11. Means of Finance
- 12. Key Assumptions
- 13. Projected Profitability Statement
- 14. Term Loan Repayment Schedule
- 15. Depreciation Schedule
- 16. Projected Cash Flow Statement
- 17. Projected Balance Sheet
- 18. Debt Service Coverage Ratio
- 19. Break-Even Analysis
- 20. Key Financial Indicators
Risks, approvals and support
An honest SWOT, the licences and registrations the activity needs, the government incentives the unit may claim (named, not counted as income), and a conclusion that states the result of the projections without overstating them.
- 21. SWOT Analysis
- 22. Statutory Approvals and Registrations
- 23. Applicable Government Incentives
- 24. Conclusion
Worked example: cost of project and means of finance
Illustrative only. The cost lines are assumptions chosen to show how the statement is built, not typical costs for the sector; the totals, contingency, loan and repayment figures are computed by the same arithmetic as our free DPR builder.
| Land | none assumed |
|---|---|
| Building and civil works | ₹25.00 lakh |
| Plant and machinery | ₹50.00 lakh |
| Other fixed assets (electrical fittings, furniture) | ₹5.00 lakh |
| Contingency (5% of building and machinery) | ₹3.75 lakh |
| Pre-operative expenses | ₹3.00 lakh |
| Margin money for working capital | ₹15.00 lakh |
| Cost of project | ₹101.75 lakh |
| Term loan (assumed 70% of the cost) | ₹71.22 lakh |
| Promoter's contribution | ₹30.53 lakh |
| Monthly principal instalment (78 instalments after a 6-month moratorium) | ₹0.91 lakh |
| Interest in the first year at 10% | ₹7.01 lakh |
Haryana and Central schemes that may apply
Open schemes an individual unit can claim, tagged in our catalogue for the agri and allied processing sector, named with each scheme's own ceiling. Whether a unit qualifies depends on its activity, size, location and stage; the eligibility checker tests that and also covers Punjab, Rajasthan and Uttar Pradesh.
Project-level incentives (2)
Capital, interest or tax incentives on the project itself. The report names them under "Applicable Government Incentives" and does not count them as income or as a source of finance until they are sanctioned.
- HaryanaHaryana Interest Subsidy Scheme 2026
5–7% interest subsidy, up to ₹20–25 Lakh per year
- HaryanaMake in Haryana Industrial Policy 2026
Large units: 2.5–20% capital subsidy + 20–70% Net SGST for 7 years
Loans and credit guarantees (3)
Not subsidies: they make the bank loan easier to get and can sit alongside the incentives.
- CentralCredit Guarantee Fund Trust for Micro and Small Enterprises
Guarantee cover on loans up to ₹10 Crore
- CentralMutual Credit Guarantee Scheme for MSMEs
60% guarantee on loans up to ₹100 Crore (75% up to ₹20 Crore for eligible exporters)
- CentralPradhan Mantri Mudra Yojana
Up to ₹20 Lakh (Tarun Plus)
Only if the activity matches (11)
Tagged for this sector in our catalogue but limited to a narrower activity; the condition is shown under each.
- HaryanaHaryana Agri-Business & Food Processing Policy 2026
25–45% of eligible capital expenditure, up to ₹2–6 Crore by scheme and area
Only if: Only agri and food processing units, agricultural co-operatives, FPOs/FPCs and ancillary units such as food packaging. The Annexure I negative list (packaged drinking water, farming itself, plain shelling, grading or polishing of rice, wheat and pulses, and plain flour, suji or maida) is excluded from the unit, linkage, cold-chain, R&D and primary-processing schemes.
- HaryanaHaryana State Startup Policy 2022
Seed grant up to ₹10 lakh; Net SGST 50% (women-led 100%) for 7 years; patent costs up to ₹25 lakh
Only if: Only DPIIT-recognised startups registered with Startup Haryana whose registered office is in Haryana (Category 1): a private limited company, registered partnership or LLP up to 10 years old, with turnover never above ₹100 crore, working on innovation.
Check status: The Supplement of 30 September 2026 added new incentives (technology transfer, micro-grants for women-led startups, exhibitions, quality certification, corporate pilots, seed-fund matching, apprenticeships). Operational schemes for these new items were not on the Department’s website when checked on 20 October 2026, and the Supplement does not say whether it restarts the policy’s five-year term. Confirm with our expert team before applying.
- HaryanaPADMA Capital Investment Subsidy and Interest Subsidy Schemes (Haryana)
25% of eligible capital investment up to ₹25 lakh (30% up to ₹30 lakh for women/SC/SHG units) + 6% interest subsidy up to ₹20 lakh a year for 5 years
Only if: Only micro and small units making the PADMA product identified for their block (one product per block in the PADMA policy list). Inside an approved PADMA cluster: new, expansion, diversification or modernisation projects; outside the cluster: only new units set up in that block around the identified product. The interest subsidy also covers services directly linked to manufacturing in the cluster (skill centre, marketing, repair, logistics, testing, tool room) as approved by SLSC-PADMA.
Check status: Both schemes run to 16 August 2028 (or the validity of the PADMA policy) by their own text, and no order closing them was found on the Directorate of MSME website on 26 October 2026. Whether new claims are being accepted after the Haryana Progressive MSME & Export Promotion Policy 2026 was not confirmed, and both schemes bar taking a similar incentive under another Haryana policy. Confirm with the District MSME Centre before applying.
- CentralAgriculture Infrastructure Fund
3% interest subvention + CGTMSE guarantee on loans up to ₹2 Crore
Only if: Only post-harvest management infrastructure (cold storage, warehouses, silos, pack houses, sorting and grading, ripening chambers), primary processing, integrated primary-and-secondary processing and listed farming assets. Standalone secondary processing (making finished foods only) is not eligible.
Check status: AIF is running on a temporary extension: the Department of Agriculture & Farmers Welfare's order of 30 September 2026 continues it, on its existing terms, until 31 March 2027 or until the scheme is approved for 2026-31, whichever comes first. The same order says no fresh sanction is permitted from the 2021-26 outlay, so confirm with your bank that it is sanctioning new AIF loans before applying.
- CentralCredit Guarantee Scheme for Startups
Guarantee on loans up to ₹20 Crore per startup (85% cover up to ₹10 Crore, 75% above)
Only if: Only for startups recognised by DPIIT.
- CentralEmergency Credit Line Guarantee Scheme 5.0
Extra credit up to 20% of peak Q4 FY26 working capital use, capped at ₹100 Crore, 100% guaranteed, nil fee
Only if: Only for borrowers that already had a working capital limit with a bank or NBFC, with the account standard on 31 March 2026.
Check status: Guarantees are given first come, first served within the scheme's overall cap of ₹2.50 lakh crore (NCGTC, 18 August 2026), and lenders can sanction only until 31 March 2027. Ask your bank whether cover is still available before you apply.
- CentralExport Promotion Mission – Collateral Support for Export Credit
Guarantee of up to 85% (micro and small) or 65% (medium) of export-linked working capital
Only if: Only for MSME exporters of goods whose HSN tariff line is on the DGFT positive list, borrowing export working capital from a member lending institution.
Check status: DGFT runs this as a pilot. The trade notice sets the limit of ₹10 crore per exporter for 2025-26; we have not confirmed the limit for 2026-27 or the guarantee fee, so ask your bank before relying on them.
- CentralExport Promotion Mission – Interest Subvention on Pre- and Post-Shipment Export Credit
2.75% a year on rupee export credit, up to ₹50 lakh per exporter a year
Only if: Only for MSME exporters with an active IEC and Udyam registration, and only on export credit for products whose six-digit HSN tariff line is on the DGFT positive list.
Check status: DGFT issued these guidelines as a pilot and reviews the rates every six months, so the 2.75% rate and the list of eligible products can change. Check the latest DGFT trade notice before relying on them.
- CentralInternational Cooperation Scheme – Capacity Building of First Time MSE Exporters (CBFTE)
75% of RCMC fee up to ₹20,000; ECGC premium up to ₹10,000 a year; 75% of testing/certification up to ₹1 lakh
Only if: Only for micro and small exporters whose Import Export Code was not more than three years old on the date of the export shipment, and who exported in the same financial year.
Check status: The International Cooperation Scheme was approved for 2021-22 to 2025-26 (to 31 March 2026). A Ministry of MSME memo of 2 April 2026 cites temporary continuation of schemes beyond 31 March 2026, up to 30 September 2026 or until the next scheme is approved, whichever is earlier; when we checked on 20 October 2026 we found no extension beyond that. The IC portal is still active (the Ministry invited trade-fair proposals in October 2026), but we saw no recent notice for this first-time-exporter component, so check with your Export Promotion Council before relying on it.
- CentralMSME Competitive (LEAN) Scheme
Basic level free; up to ₹1.08 lakh (Intermediate) and ₹2.16 lakh (Advanced) of the consultant cost
Only if: Intermediate and Advanced levels are taken up by a Group of Enterprises (GoE) formed on the LEAN portal, not by a unit alone.
Check status: The LEAN guidelines say the scheme's financial support is valid until 31 March 2026. A Ministry of MSME memo of 2 April 2026 cites temporary continuation of schemes beyond 31 March 2026, up to 30 September 2026 or until the next scheme is approved, whichever is earlier; when we checked on 20 October 2026 we found no extension beyond that. The LEAN portal is still active and takes registrations, so confirm there before you commit to a consultant.
- CentralNational SC-ST Hub Scheme (including Special Credit Linked Capital Subsidy)
25% capital subsidy on plant and machinery, up to ₹25 lakh, plus fee reimbursements
Only if: Only for micro and small enterprises owned by SC or ST entrepreneurs: an SC/ST proprietor, or at least 51% SC/ST holding in a partnership or company.
Check status: The National SC-ST Hub guidelines apply until 31 March 2026, and further continuation "shall be subject to review/evaluation". A Ministry of MSME memo of 2 April 2026 cites temporary continuation of schemes beyond 31 March 2026, up to 30 September 2026 or until the next scheme is approved, whichever is earlier; when we checked on 20 October 2026 we found no extension beyond that. The Hub's portal is still active and taking applications, so confirm with your nearest National SC-ST Hub office before you rely on the subsidy.
Export incentives (3)
Only if the unit exports or plans to.
- HaryanaHaryana Export Credit Insurance & Interest Subvention 2026
40% of ECGC premium (₹5 Lakh/yr) + 3% interest subvention (₹10 Lakh/yr)
- HaryanaHaryana Freight Subsidy for Exporters 2026
1% of FOB value, up to ₹10–30 Lakh per year by area
- HaryanaMukhya Mantri Pratham Niryatak Protsahan Yojna 2026
33% assistance, up to ₹20 Lakh per year for 3 years
Support for particular costs (15)
Each covers one kind of cost (certification, testing, solar, insurance, fairs and similar) with its own application.
- HaryanaHaryana Circular Economy Promotion for MSEs 2026
25% up to ₹50 Lakh, or 40% up to ₹1 Crore by area
- HaryanaHaryana E-Commerce Support for MSEs 2026
75% of platform fees — up to ₹2 Lakh/yr (exporters) or ₹1 Lakh/yr (domestic), for 5 years
- HaryanaHaryana Employment Generation Scheme 2026
Up to ₹1.00–1.20 Lakh per employee per year for 10 years
- HaryanaHaryana Energy Efficiency Promotion for MSEs 2026
25% up to ₹50 Lakh, or 40% up to ₹1 Crore by area
- HaryanaHaryana Environment Compliance Assistance (ETP & ZLD) 2026
25% — up to ₹1 Crore (ETP, Sub-Prime & Prime/Focus only) or ₹5 Crore (ZLD)
- HaryanaHaryana Market Development Assistance Scheme 2026
25% — up to ₹5 Lakh (international fair) or ₹3 Lakh (domestic fair), plus travel
- HaryanaHaryana MSME AI Solutions and AI Lab Adoption Scheme 2026
33% — up to ₹10 Lakh for AI solutions, ₹15 Lakh for an in-house AI lab
- HaryanaHaryana MSME Automation Scheme 2026
25% of cost, up to ₹50 Lakh – ₹1 Crore by area
- HaryanaHaryana MSME Insurance Scheme 2026
33% of premium, up to ₹5 Lakh per year for 3 years
- HaryanaHaryana Quality Certification Assistance Scheme
50% of certification cost, up to ₹10 Lakh/year (60% and ₹20 Lakh/year for exporters)
- HaryanaHaryana Solar Rooftop Support for MSMEs 2026
30% of eligible capital investment, up to ₹25–35 Lakh by area
- HaryanaHaryana Stamp Duty Refund Scheme 2026
30–100% refund of stamp duty, by area category
- CentralMSME Innovative Scheme – Design Component
75% (micro) or 60% (small and medium) of a design project, up to ₹40 lakh
Check status: The MSME Innovative Scheme is part of MSME Champions, approved for 2021-22 to 2025-26 (to 31 March 2026). A Ministry of MSME memo of 2 April 2026 cites temporary continuation of schemes beyond 31 March 2026, up to 30 September 2026 or until the next scheme is approved, whichever is earlier; when we checked on 20 October 2026 we found no extension beyond that. The MSME Innovative (Design) portal is still active, so confirm there before you commit to a design project.
- CentralMSME Innovative Scheme – IPR Reimbursement (Patent, Trademark, Design)
100% of registration cost: up to ₹5 lakh per foreign patent, ₹1 lakh per Indian patent, ₹15,000 per design, ₹10,000 per trademark
Check status: The MSME Innovative Scheme is part of MSME Champions, approved for 2021-22 to 2025-26 (to 31 March 2026). A Ministry of MSME memo of 2 April 2026 cites temporary continuation of schemes beyond 31 March 2026, up to 30 September 2026 or until the next scheme is approved, whichever is earlier; when we checked on 20 October 2026 we found no extension beyond that. The IPR reimbursement portal is still active, so confirm there before you rely on reimbursement.
- CentralProcurement and Marketing Support Scheme
Trade fairs: 80–100% of space rent, up to ₹1.50 lakh per event; bar code and e-commerce support for micro units
Check status: The PMS guidelines were issued for 2021-22 to 2025-26. An Office of the Development Commissioner (MSME) memo of 2 April 2026 says a proposal to continue PMS up to 30 September 2026, or until the restructured scheme is approved (whichever is earlier), on the same terms, was under process with the Department of Expenditure. The Office amended the scheme on 7 September 2026 for events from 1 October 2026, and the PMS portal (launched 27 June 2026) is active, but we found no order extending PMS beyond 30 September 2026 when we checked on 20 October 2026. Confirm with the Office of the Development Commissioner (MSME) before you spend on a fair or registration. Budget 2026-27 provides ₹65 crore for PMS (Ministry of MSME, Notes on Demands for Grants 2026-27); no formal continuation order was found when checked on 20 October 2026.
Planning a manufacturing unit in Haryana? See what the 2026 policy could pay by project size and area category and the subsidy stacking blueprints.
Questions about a project report for an agri or livestock processing unit
What does a bank look for in a project report for an agri or livestock processing unit?
A complete bank-format report in which the description and the figures agree. For an agri or livestock processing unit the descriptive part should walk through the process (collection or procurement of produce from farmers, collection centres or mandis, with quality checks, through to packing, storage and dispatch to buyers), the inputs (farm produce or livestock products suited to the activity, permitted additives and packing material), the utilities and the approvals. The financial part then shows the cost of project, means of finance, projected profitability, cash flow, balance sheet, loan repayment, debt service coverage and break-even. Buyers look for consistent quality, freshness, reliable supply and price.
Which licences and approvals does an agri or livestock processing unit usually need?
Besides Udyam registration, GST registration where turnover or the type of supply requires it, and the power and local-body approvals for the premises, the sector notes in our DPR library list: Registration or licence from the Food Safety and Standards Authority of India (FSSAI) for food products, appropriate to the scale of operations; Consent to Establish and Consent to Operate from the State Pollution Control Board, where the activity falls within its consent categories; Approvals from the State animal husbandry or agriculture department for feed, dairy or livestock activities, where applicable; Legal metrology registration for pre-packed products sold to consumers. These are typically required where applicable; whether each applies depends on the size, location and activity of the project, and our expert team confirms it for a specific unit.
What risks will a lender ask about for an agri or livestock processing unit?
Seasonal and price variation of raw material, met by storage, procurement planning and tie-ups with farmer groups; Quality and safety lapses, met by testing, hygienic handling and records. A report that names its risks and shows how each is handled reads as more credible than one that lists only strengths, and the same points feed the SWOT section of the DPR.
Which Haryana and Central schemes may apply to an agri or livestock processing unit?
Our catalogue lists 34 open Haryana and Central schemes tagged for the agri and allied processing sector, including Haryana Interest Subsidy Scheme 2026 (5–7% interest subsidy, up to ₹20–25 Lakh per year) and Make in Haryana Industrial Policy 2026 (Large units: 2.5–20% capital subsidy + 20–70% Net SGST for 7 years). Whether a unit qualifies depends on its activity, size, location and stage, so run the eligibility checker before counting on any of them; Punjab, Rajasthan and Uttar Pradesh schemes are matched there too.
Are the cost figures on this page typical for the sector?
No. They are assumed lines put through the same cost and loan arithmetic as our free DPR builder, to show how the statement is built: contingency at 5% of building and machinery, a term loan of 70% of the cost, 10% interest over 7 years with a 6-month moratorium. Your own report should use your quotations, rent or land figures and the bank's terms.
Can I prepare the project report myself?
Yes. The free DPR builder asks for the project details and costs, pre-fills the agri and allied processing sector's descriptive text, and produces all 24 sections with the projections, which you can download in Word, PDF or Excel. Before it goes to a bank or a department it should be reviewed by a Chartered Accountant; our expert team can review it or prepare it with you.
Official sources this page relies on
The notifications our catalogue read each listed scheme from, and the registration every scheme asks for. The sector notes above are our own and carry no official figure.
- Haryana Agri-Business & Food Processing Policy 2026: Haryana Agri-Business & Food Processing Policy 2026 — Haryana Govt. Gazette (Extra.) No. 82-2026/Ext, 29 May 2026 (notification No. 02/02/2026-1IB-II)
- Haryana Circular Economy Promotion for MSEs 2026: Haryana Progressive MSME & Export Promotion Policy 2026 — Haryana Govt. Gazette (Extra.) No. 114-2026/Ext, 29 July 2026
- Haryana State Startup Policy 2022: Haryana State Startup Policy 2022 (No. Admn/459/1SIT/17601, 7 Jul 2022), with its Supplement in Haryana Govt. Gazette (Extra.) No. 150-2026/Ext, 30 Sep 2026 (No. 20/14/2026-4IB-1); incentive schemes in Gazette 112-2024/Ext, 23 Jul 2024
- Make in Haryana Industrial Policy 2026: Make in Haryana Industrial Policy 2026 — Haryana Govt. Gazette (Extra.) No. 80-2026/Ext, 26 May 2026 (notification No. 20/06/2026-4IB-1)
- PADMA Capital Investment Subsidy and Interest Subsidy Schemes (Haryana): PADMA Capital Investment Subsidy Scheme and PADMA Interest Subsidy Scheme — Industries & Commerce Department notifications No. 12/02/2022-1IB-II of 4 March 2024, Haryana Govt. Gazette No. 10-2024 (5 March 2024); PADMA policy re-notified 17 August 2023 (Gazette No. 34-2023)
- Agriculture Infrastructure Fund: AIF Revised Scheme Guidelines (September 2024), paras 4–9 and 13; DA&FW OM No. R-11016/16/2020-I&P (87654), 30 September 2026 (temporary extension beyond 30.09.2026), citing DoE OM No. 66(12)PFC-I/2026-IK, 28.09.2026
- Credit Guarantee Fund Trust for Micro and Small Enterprises: CGTMSE Circular No. 250/2024-25 (Ref. CGTMSE/273), 18 March 2025 (cover raised to ₹10 crore); Circulars 259/2025-26 (18 Mar 2026) and 261/2026-27 (15 Jun 2026) on the Micro Credit Card; Circular 262/2026-27 (15 Jun 2026) on TReDS
- Credit Guarantee Scheme for Startups: PIB, 9 May 2025 (amended CGSS: cover up to ₹20 crore, 85%/75% cover, 1% fee for the 27 Champion Sectors); Startup India Playbook, June 2026, p. 35; scheme first notified on 6 October 2022
- Emergency Credit Line Guarantee Scheme 5.0: Union Cabinet decision of 5 May 2026 (pmindia.gov.in); NCGTC letters 0264/NCGTC/ECLGS5.0 (8 May 2026, operational guidelines), 0885/NCGTC/ECLGS 5.0 (3 August 2026, non-MSME sanctions stopped) and 0961/NCGTC/ECLGS5.0 (18 August 2026, ₹2.50 lakh crore cap)
- Export Promotion Mission – Collateral Support for Export Credit: DGFT Trade Notice No. 21/2025-26, 2 January 2026 (F.No. 01/02/60/AM-26/EPM); CGTMSE Circular 257/2025-26, 6 February 2026
- Export Promotion Mission – Interest Subvention on Pre- and Post-Shipment Export Credit: DGFT Trade Notice No. 20/2025-26, 2 January 2026 (F.No. 01/02/48/AM-26/EPM), amended by Trade Notices 22 and 33/2025-26 and 01, 03, 13 and 17/2026-27; Export Promotion Mission approved by the Union Cabinet on 12 November 2025
- International Cooperation Scheme – Capacity Building of First Time MSE Exporters (CBFTE): Guidelines of Sub-Component II (CBFTE) of the International Cooperation Scheme, Ministry of MSME OM F.No. 4(8)/2021-IC, July 2022; IC portal FAQs and implementing agencies; D.O. No. 4(3)/2026-IC, 6 October 2026; O/o DC (MSME) OM of 2 April 2026
- MSME Competitive (LEAN) Scheme: MSME Competitive (LEAN) Scheme Guidelines 2022 (component of MSME Champions), paras 2.4, 4 and 9.0; scheme validity clause p. 4; LEAN portal (read 20 Oct 2026); O/o DC (MSME) OM No. 5(9)/2021-22/PMS/Misc, 2 April 2026
- MSME Innovative Scheme – Design Component: Guidelines of MSME Innovative Scheme (2022), §4.2 Design component; O/o DC (MSME) OM No. 5(9)/2021-22/PMS/Misc, 2 April 2026
- Mutual Credit Guarantee Scheme for MSMEs: NCGTC letter 1431/NCGTC/MCGS-MSME, 27 January 2025, and operational guidelines as modified on 24 February 2026 (NCGTC product page); PIB, 21 March 2026 (service-sector MSMEs, upfront contribution)
- National SC-ST Hub Scheme (including Special Credit Linked Capital Subsidy): Revised Guidelines of National SC-ST Hub Scheme for the 15th Financial Cycle (2021-22 to 2025-26), Ministry of MSME OM No. K-02/6/2023-SME-Part(1), 15 May 2025; scsthub.in (read 20 Oct 2026); O/o DC (MSME) OM of 2 April 2026
- Pradhan Mantri Mudra Yojana: Pradhan Mantri MUDRA Yojana (mudra.org.in); Tarun Plus category added by Union Budget 2024-25
- Procurement and Marketing Support Scheme: PMS Guidelines, O/o DC (MSME) OM No. 5(1)/2021-22/PMS, 26 July 2022 (copy on msme.gov.in, 26 June 2026); PIB, 27 June 2026 (PMS portal); O/o DC (MSME) OMs No. 5(9)/2021-22/PMS/Misc, 2 April 2026, and No. 5(7)/2024-25/PMS/PMvBen, 7 September 2026 (Udyam Assist)
- Udyam Registration portal (Ministry of MSME)
- Ministry of Micro, Small and Medium Enterprises
Page checked on 10 November 2026.
Need this project report done? Talk to our expert team
Leave your name and mobile number. Our team calls you back within one working day (Monday to Saturday).
Your details are never sold; they are shared only as our Privacy Policy describes.
Prepare your report
Build a bank-format DPR for an agri or livestock processing unit in the free builder, or ask our expert team to prepare or review it with you.